Hydroelectric plant marks change at Falls Hotel

Irish Times | Jan 19, 2020 at 5:55 PM
  • More than 6,000 kilowatt hours of electricity were consumed during the general election count for the Clare constituency at the Falls Hotel in Ennistymon in 2016.
  • Plans are also in place to develop a pumping system that would see all of the hotel’s hot water generated from renewable sources.
  • During the development of the hotel’s hydroelectric plant, care was taken to ensure that wildlife in the river, including spawning fish, was not impacted.