HS2 caught up in a row over the potential disturbance of the Bechstein’s bat

The Telegraph | Jun 3, 2020 at 7:28 PM
  • Construction of the high speed rail link requires trees along its route to be felled and campaigners are concerned that maternity roosts for bats are being disturbed in the process.