Siemens Mobility receives first order for battery-powered trains

Siemens | Mar 17, 2020 at 12:00 AM

Landesanstalt Schienenfahrzeuge Baden-Württemberg (SFBW) has ordered 20 Mireo Plus B trains from Siemens Mobility. The two-car electric trainsets with 120 seats can operate on rail routes with or without overhead power lines thanks to their battery hybrid drive, and are scheduled to operate in Network 8 of the Ortenau regional system. The contract also includes maintenance of the trains by Siemens Mobility for a period of just under 30 years. State Minister for Transport Winfried Hermann said: “This marks the first time battery-powered trains will be used in the state. With this innovative technology, the electrification of rail routes without continuous overhead power lines will also be possible”.